Live Tenders
| Tender No | Title | Open Date | Close Date | Tender Document | Remarks | |
|---|---|---|---|---|---|---|
| 17/IITPKD/EWD/2026-27/347 | Construction of Permanent campus for IIT Palakkad under Phase B, SH : Contingency SW: Construction of Additional office space for EWD at Sahyadri Campus - Internal Electrical Works | 23/10/26 | 05/11/26 11:00 am | Tender Document (721.47 KB) Drawing (5).pdf (939.63 KB) | ||
| 17/IITPKD/EWD/2026-27/324 | Operation of 525 KLD SBR Technology-based STP and 600 KLD WTP firefighting and fire detection system at Sahyadri Campus for the year 2026-27. | 22/10/26 | 12/11/26 11:00 am | Tender document 324.pdf (527.33 KB) | ||
| 17/IITPKD/EWD/2026-27/325 | Annual maintenance of external services in the Nila and Sahyadri Campus for the year 2026-27. SH: Providing manpower for day-to-day maintenance of water supply and drainage line | 22/10/26 | 12/11/26 11:00 am | Tender Document - 325.pdf (477.24 KB) | ||
| 17/IITPKD/EWD/2026-27/337 | Construction of Permanent campus for IIT Palakkad under Phase B, SH: SITC of 1252 kWp Solar Generation system including Solar PV Panel, Inverter and connection, supporting structures etc. at Sahyadri Campus | 14/10/26 | 03/11/26 11:00 am | NIT document.pdf (1.81 MB) Saraswati Block (A01)_SLD (127.09 KB) Department Building (B03 & B04) - Building Plan (223.31 KB) Dr. APJ Abdul Kalam Block (D03)_SLD (127.55 KB) Saveri Block (Hostel Block) - Building Plan (204.46 KB) Kedaram Block (L01)_SLD (111.96 KB) A01 Block (Saraswati) - Building Plan (1.23 MB) Department Building (B03 & B04)_SLD (128.6 KB) Dr. APJ Abdul Kalam Block (D03) - Building Plan (65.61 KB) Malhar Block (K01)_SLD (124.61 KB) Kedaram Block (L01)_Building plan (117.63 KB) Type V Qtrs (3 Blocks) (537.54 KB) Typical Schematic Diagram for Automation (196.84 KB) Minutes of the pre bid meeting (81.82 KB) | ||
| 17/IITPKD/EWD/2026-27/148 | Construction of Permanent Campus for IIT Palakkad under Phase B SH: External Development SW: Providing, Laying, Testing and Commissioning of DI Water Supply Pipeline from the water treatment plant (H04) in Sahyadri Campus to the Sump Tank at the Nila Camp | 04/09/26 | 27/10/26 11:00 am | WATER LINE H4 to NILA.pdf (2.91 MB) 148 - Tender document (1).pdf (505.66 KB) | https://mhrd.ewizard.in. The tender has been extended up to 27.10.2026, 1100 hrs |
|
| TENDER/2026-27/222 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF NETWORK SWITCH – 48 PoE+ | 06/10/26 | 27/10/26 03:00 pm | TENDER_DOCUMENT.pdf (368.15 KB) |

