Closed Tenders
Tender No | Title | Open Date | Close Date | Tender Document | Remarks | |
---|---|---|---|---|---|---|
TENDER/2023-24/438 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SQUID MAGNETOMETER WITH CLOSED-CYCLE 4HE CRYOSTAT AND SUPERCONDUCTING MAGNET | 04/01/24 | 30/01/24 03:00 pm | TENDER_DOCUMENT_2023-24_438.pdf (189.96 KB) ADDENDUM - I (92.39 KB) ADDENDUM - II (180.47 KB) CORRIGENDUM - I (101.1 KB) | ||
TENDER/2023-24/432 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MICROPLATE SPECTROPHOTOMETER | 05/01/24 | 29/01/24 03:00 pm | TENDER_DOCUMENT_2023-24_432.pdf (188.79 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/055 | Name of Work : Construction of Gas Bank for CIF and Mechanical lab at Dr.APJ Abdul Kalam block (D03), Sahyadri Campus | 09/01/24 | 23/01/24 03:00 pm | Document (632.13 KB) | ||
17/ IITPKD/EWD/2023-24/053 | Name of Work : Construction of Precision Farm (SATCARD) for IIT Palakkad SW : Construction of 40,000 liters capacity RCC UG Sump tank for precision farming at Sahyadri campus | 09/01/24 | 23/01/24 03:00 pm | Document (409.25 KB) | ||
17/ IITPKD/EWD/2023-24/051 | Supply and fixing sliding glass cover pin boards with lock arrangement at Saraswathi block, Malhar and Saveri in Sahyadri campus | 05/01/24 | 22/01/24 03:00 pm | Document (695.42 KB) | ||
TENDER/2023-24/394 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MERLIN, BENKELMAN BEAM & BUMP INTEGRATOR | 19/12/23 | 22/01/24 03:00 pm | TENDER_DOCUMENT_2023-24_394.pdf (306.23 KB) CORRIGENDUM - I (99.86 KB) | ||
TENDER/2023-24/375 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TOOL’S MAKERS MICROSCOPE | 29/12/23 | 19/01/24 03:00 pm | TENDER_DOCUMENT_2023-24_375.pdf (170.08 KB) | ||
TENDER/2023-24/397 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF WATER CHILLER | 21/12/23 | 19/01/24 03:00 pm | TENDER_DOCUMENT_397.pdf (333.21 KB) TENDER_2023-24_397 CORRIGENDUM-I (1).pdf (100.52 KB) | ||
TENDER/2023-24/320 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LASER MICRO MACHINING CENTRE | 07/12/23 | 19/01/24 03:00 pm | TENDER_DOCUMENT- 2023-24_320.pdf (441.28 KB) PRE_BID_MEETING_Minutes-320 (1).pdf (143.3 KB) CORRIGENDUM-I (99.86 KB) CORRIGENDUM-II (99.74 KB) TENDER_2023-24_320 Corrigendum03 (1).pdf (99.99 KB) | ||
17/ IITPKD/EWD/2023-24/050 | Name of Work : Construction of Permanent Campus for IIT Palakkad under Phase 1A SW: Providing False Ceiling AC duct and corridor of first floor in C06 at Sahyadri Campus | 02/01/24 | 15/01/24 05:39 pm | Document (451.07 KB) | ||
TENDER/2023-24/373 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF POWER QUALITY MONITORING SYSTEM | 04/12/23 | 12/01/24 05:00 pm | TENDER_DOCUMENT-2023-24-373.pdf (195.78 KB) CORRIGENDUM-I (104.92 KB) CORRIGENDUM - II (100.63 KB) CORRIGENDUM - III (100.76 KB) CORRIGENDUM - IV (101.04 KB) CORRIGENDUM - V (101.33 KB) | ||
TENDER/2023-24/PRJ-073 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CONTINUOUS SOIL MOISTURE PROFILE SENSOR | 21/12/23 | 12/01/24 03:00 pm | TENDER_DOCUMENT_PRJ_073.pdf (425.8 KB) | ||
TENDER/2023-24/376 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PORTABLE VECTOR NETWORK ANALYZER | 19/12/23 | 10/01/24 03:00 pm | TENDER_DOCUMENT_2023-24_376.pdf (190.09 KB) | ||
TENDER/2023-24/418 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SURFACE STRAIN GAUGES AND STRAIN ROSETTES FOR STEEL AND CONCRETE SPECIMENS | 19/12/23 | 10/01/24 03:00 pm | TENDER_DOCUMENT_418.pdf (332.07 KB) | ||
17/ IITPKD/EWD/2023-24/048 | Providing additional terrace water tank for Malhar(K01) & Saveri (K02) hostel at Sahyadri campus | 22/12/23 | 09/01/24 03:00 pm | Document (371.85 KB) | The tender has been extended up to 09.01.2024, 1500 hrs |
|
TENDER/2023-24/PRJ_071 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPTICAL MICROSCOPE WITH CAMERA AND SOFTWARE | 15/12/23 | 09/01/24 03:00 pm | TENDER_DOCUMENT_2023-24_PRJ_071.pdf (189.09 KB) Corrigendum_01 (100.5 KB) | ||
TENDER/2023-24/110 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH PERFORMANCE COMPUTING FACILITY | 03/10/23 | 09/01/24 03:00 pm | TENDER_DOCUMENT- 2023-24-110.pdf (356.87 KB) CORRIGENDUM (99.17 KB) CORRIGENDUM - II (99.43 KB) Pre-bid meeting minutes (170.47 KB) CORRIGENDUM - III (99.66 KB) MINUTES OF PREBID MEETING (252.99 KB) CORRIGENDUM - IV (988.8 KB) Corrigendum-V - TENDER-2023-24-110.pdf (151.58 KB) Corrigendum-VI-TENDER_2023-24_110.pdf (139 KB) Corrigendum07-TENDER_2023-24_110.pdf (99.83 KB) | ||
TENDER/2023-24/352 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DESKTOP COMPUTERS | 07/12/23 | 08/01/24 03:00 pm | TENDER_DOCUMENT_352.pdf (332 KB) CORRIGENDUM-I (99.92 KB) | ||
17/IITPKD/EWD/2023-24/049 | PROVIDING POWER AND NETWORK POINTS TO FACULTY AND RESEARCH SCHOLAR ROOMS IN C06 BUILDING AND LIGHT FITTINGS & FANS IN STUDIO CLASSROOM OF SARASWATHI BUILDING OF SAHYADRI CAMPUS OF IIT PALAKKAD | 26/12/23 | 06/01/24 03:10 pm | Document (302.65 KB) | ||
17/IITPKD/EWD/ELE/2023-24/049 | PROVIDING POWER AND NETWORK POINTS TO FACULTY AND RESEARCH SCHOLAR ROOMS IN C06 BUILDING AND LIGHT FITTINGS & FANS IN STUDIO CLASSROOM OF SARASWATHI BUILDING OF SAHYADRI CAMPUS OF IIT PALAKKAD | 23/12/23 | 06/01/24 03:00 pm | Document (302.65 KB) | ||
17/ IITPKD/EWD/2023-24/051 | Name of Work : Construction of Permanent Campus for IIT Palakkad under Phase 1A SH : Furniture Supply and fixing sliding glass cover pin boards with lock arrangement at Saraswathi block, Malhar and Saveri in Sahyadri campus | 02/01/24 | 05/01/24 05:43 pm | Document (695.42 KB) | ||
TENDER/2023-24/369 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF NETWORK ATTACHED STORAGE SYSTEM | 13/12/23 | 04/01/24 03:00 pm | TENDER_DOCUMENT_369.pdf (337.05 KB) | ||
GTE/2023-24/087 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF AUTOMATED DRIP IRRIGATION SYSTEM | 04/12/23 | 03/01/24 10:00 am | TENDER_DOCUMENT_087.pdf (955.63 KB) PRE_BID_MEETING_Minutes _12-12-2023 (1).pdf (156.61 KB) | ||
17/ IITPKD/EWD/2023-24/047 | Supply, installation and commissioning of Gas Pipeline for CIF Lab at Dr. APJ Abdul Kalam Block (D03) – Sahyadri Campus | 22/12/23 | 02/01/24 03:00 pm | Document (556.54 KB) | ||
TENDER/2023-24/344 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 1200°C MUFFLE FURNACE | 29/11/23 | 28/12/23 03:00 pm | TENDER_DOCUMENT_2023-24_344.pdf (183.85 KB) Corrigendum01_TENDER_2023-24_344.pdf (100.16 KB) | ||
TENDER/2023-24/PRJ_069 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF IMPEDANCE TUBE TEST FACILITY | 30/11/23 | 28/12/23 03:00 pm | TENDER_DOCUMENT-PRJ_069.pdf (203.79 KB) Corrigendum01_TENDER_2023-24_PRJ_069.pdf (100.33 KB) Minutes_Pre-bid_Meeting_TENDER- 2023-24_PRJ_069.pdf (193.96 KB) | ||
TENDER/2023-24/323 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DESKTOP | 23/11/23 | 26/12/23 11:45 pm | TENDER_DOCUMENT-2023-24-323.pdf (186.77 KB) CORRIGENDUM01 (100.03 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/044 | Supply and Installation of Computer table and Chairs in A01-109, Computer Lab, Sahyadri Campus | 07/12/23 | 26/12/23 03:00 pm | Tender Document (569.12 KB) Corrigendum (99.98 KB) Revised Drawing (142.57 KB) | ||
17/ IITPKD/EWD/2023-24/046 | Providing & Fixing light weight partition in First floor of the (D03) Dr. APJ Abdul Kalam block at Sahyadri campus | 14/12/23 | 26/12/23 03:00 pm | Partition work.pdf (529.63 KB) Corrigendum 1 (114.01 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/045 | Supply and Fixing of Mirror in GYM at Kedaram block in Sahyadri Campus | 07/12/23 | 26/12/23 03:00 pm | Tender document (284.76 KB) Corrigendum (324.42 KB) | ||
TENDER/2023-24/301 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DESKTOP | 28/11/23 | 26/12/23 10:00 am | TENDER_DOCUMENT_2023-24_301.pdf (180.51 KB) Corrigendum01_TENDER_2023-24_301.pdf (100.03 KB) | ||
TENDER/2023-24/251 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INVERTED PENDULUM SETUP | 01/12/23 | 22/12/23 03:00 pm | TENDER_DOCUMENT_251.pdf (338.86 KB) | ||
TENDER/2023-24/326 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DESKTOP PC | 22/11/23 | 22/12/23 03:00 pm | TENDER_DOCUMENT_2023-24_326.pdf (180.53 KB) Corrigendum01_TENDER_2023-24_326.pdf (99.7 KB) | ||
TENDER/2023-24/287 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPTICS COMPONENTS – GRATING, LENS, PRISMS, POLARIZERS, MOUNTS, BEAM SPLITTER | 01/12/23 | 22/12/23 03:00 pm | TENDER_DOCUMENT_287.pdf (426.34 KB) | ||
TENDER/2023-24/324 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DUAL CHANNEL PRECISION SOURCE METER WITH INTERFACE SOFTWARE | 01/12/23 | 22/12/23 03:00 pm | TENDER_DOCUMENT_2023-24_324.pdf (191.31 KB) | ||
TENDER/2023-24/300 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DUAL CHANNEL FUNCTION GENERATORS | 22/11/23 | 21/12/23 03:00 pm | TENDER_DOCUMENT_300.pdf (340.94 KB) CORRIGENDUM-I (99.25 KB) | ||
TENDER/2023-24/334 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF NFS SERVER | 28/11/23 | 21/12/23 03:00 pm | TENDER_DOCUMENT_334.pdf (330.89 KB) CORRIGENDUM-I (99.89 KB) | ||
TENDER/2023-24/308 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF WORKSTATION | 21/11/23 | 20/12/23 03:00 pm | TENDER_DOCUMENT_308 (1).pdf (315.04 KB) CORRIGENDUM-I (73.82 KB) CORRIGENDUM-II (120.25 KB) CORRIGENDUM-III (124.85 KB) | ||
TENDER/2023-24/290 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LAPTOPS | 28/11/23 | 19/12/23 03:00 pm | TENDER_DOCUMENT_290.pdf (315.83 KB) | ||
TENDER/2023-24/309 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DIGITAL STORAGE OSCILLOSCOPE | 22/11/23 | 18/12/23 03:00 pm | TENDER_DOCUMENT- 2023-24-309.pdf (187.79 KB) CORRIGENDUM-1_TENDER_2023-24_309.pdf (99.83 KB) | ||
TENDER/2023-24/299 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DEEP FREEZER, -20 DEGREE | 15/11/23 | 15/12/23 03:00 pm | TENDER_DOCUMENT- 2023-24-299.pdf (187.81 KB) CORRIGENDUM-01 (100.23 KB) | ||
TENDER/2023-24/332 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH-END DESKTOP | 23/11/23 | 15/12/23 03:00 pm | TENDER_DOCUMENT_332.pdf (331.02 KB) | ||
TENDER/2023-24/298 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LASER OPTICAL SUB-MICRON DISPLACEMENT MEASUREMENT SYSTEM WITH ASSOCIATED SIGNAL CONDITIONING, CABLES AND INTERFACING | 23/11/23 | 15/12/23 03:00 pm | TENDER_DOCUMENT_298.pdf (333.82 KB) | ||
17/ IITPKD/EWD/2023-24/042 | Providing additional terrace water tank for Malhar(K01) & Saveri (K02) hostel at Sahyadri campus | 25/11/23 | 15/12/23 03:00 pm | Tender document (327.25 KB) | ||
TENDER/2023-24/292 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DIGITAL OSCILLOSCOPE | 22/11/23 | 14/12/23 03:00 pm | TENDER_DOCUMENT_292.pdf (327.41 KB) | ||
TENDER/2023-24/281 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OPTICAL BREADBOARD WITH VIBRATION ISOLATION | 23/11/23 | 14/12/23 03:00 pm | TENDER_DOCUMENT_2023-24_281.pdf (168.99 KB) | ||
TENDER/2023-24/PRJ_044 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MICRO NANO INDENTER | 18/10/23 | 14/12/23 03:00 pm | TENDER_DOCUMENT- 2023-24_PRJ-044.pdf (481.78 KB) PRE BID MINUTES (273.57 KB) CORRIGENDUM-I (82.08 KB) CORRIGENDUM-III (81.95 KB) CORRIGENDUM-04 (99.96 KB) CORRIGENDUM-V (82.37 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/043 | Supply of Furniture for the Library at Saraswati Block in Sahyadri Campus | 25/11/23 | 08/12/23 03:00 pm | Tender Document (3.11 MB) | ||
TENDER/2023-24/310 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CREEP TESTING MACHINE | 15/11/23 | 07/12/23 03:00 pm | TENDER_DOCUMENT- 2023-24-310.pdf (184.04 KB) | ||
TENDER/2023-24/PRJ_060 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SPLIT HOPKINSON PRESSURE BAR TEST SETUP | 15/11/23 | 07/12/23 03:00 pm | TENDER_DOCUMENT- 2023-24-PRJ_060.pdf (189.88 KB) | ||
TENDER/2023-24/254 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ADVANCED SPECTROPHOTOMETER WITH THETA TWO THETA REFLECTANCE MEASUREMENT | 15/11/23 | 07/12/23 03:00 pm | TENDER_DOCUMENT- 2023-24-254.pdf (189.09 KB) | ||
TENDER/2023-24/285 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MANUAL ROCK PERMEABILITY APPARATUS | 14/11/23 | 06/12/23 03:00 pm | TENDER_DOCUMENT_285_0.pdf (331.32 KB) | ||
TENDER/2023-24/234 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PRECISION DIAMOND WIRE CUTTER | 02/11/23 | 05/12/23 03:00 pm | TENDER_DOCUMENT_2023-24_234.pdf (188.22 KB) CORRIGENDUM01 (99.82 KB) | ||
17/IITPKD/EWD/2023-24/041 | PROVIDING POWER AND NETWORK POINTS FOR VARIOUS CABINS IN FIRST FLOOR OF D03 BLOCK AT SAHYADRI CAMPUS | 21/11/23 | 05/12/23 03:00 pm | Tender Document (424.06 KB) Drawing_1 (327.55 KB) Drawing_2 (404.47 KB) Drawing_3 (471.35 KB) Drawing_4 (416.06 KB) | Due to Administrative reason, the date and time of tender opening is rescheduled to 05.12.2023 at 11 am |
|
TENDER/2023-24/220 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF WORKSTATION WITH SMALL-SCALE GPU CARD | 07/11/23 | 04/12/23 03:00 pm | TENDER_DOCUMENT- 2023-24-220.pdf (184.36 KB) Corrigendum01_TENDER_2023-24_220..pdf (100.24 KB) | ||
TENDER/2023-24/239 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DIGITAL IMAGE CORRELATION (DIC) SYSTEM | 09/11/23 | 01/12/23 03:00 pm | TENDER_DOCUMENT_239.pdf (387.38 KB) Pre-bid Meeting Minutes (82.25 KB) | ||
TENDER/2023-24/222 | SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OF VARIOUS EQUIPMENT FOR THE ESTABLISHMENT OF THE CONTROL LAB | 07/11/23 | 29/11/23 03:00 pm | TENDER_DOCUMENT- 2023-24-222.pdf (246.26 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/040 | Re tender - Providing additional terrace tank over dining hall at Sahyadri campus | 20/11/23 | 28/11/23 03:00 pm | Tender Document (346.29 KB) | ||
TENDER/2023-24/213 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ROCK SURFACE LAPPING MACHINE | 03/11/23 | 27/11/23 03:00 pm | TENDER_DOCUMENT_213.pdf (325.18 KB) | ||
17/ IITPKD/EWD/2023-24/039A | Shifting of Furniture from Academic Block, Hostel 3, Ahalia Integrated campus, Kozhipara, Palakkad - 678 557 to Research Complex (D03), Additional Lab & Classroom Complex (C06), Department Building (B03) of IIT Palakkad Permanent campus (Sahyadri Campus), | 17/11/23 | 23/11/23 11:00 am | Tender document Recall 1 (248.3 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/036 | Construction of Basket Ball Court near Malhar Hostel Block – Sahyadri Campus | 27/10/23 | 22/11/23 03:00 pm | Tender document (252.35 KB) Corrigendum II (304.73 KB) | The tender has been extended up to 22.11.2023, 1500 hrs |
|
17/IITPKD/EWD/CIVIL/2023-24/035 | Construction of Gas Bank for Chemistry Lab at Saraswati Block (A01) , Sahyadri Campus | 27/10/23 | 22/11/23 03:00 pm | Tender document (319.22 KB) Corrigendum II (323.01 KB) | The tender has been extended up to 22.11.2023, 1500 hrs |
|
17/IITPKD/EWD/CIVIL/2023-24/038 | Providing and Fixing Sound Proofing of Music Rooms in Malhar Hostel Block at Sahyadri Campus | 01/11/23 | 21/11/23 03:30 pm | Tender document (366.28 KB) Corrigendum 1 (323.1 KB) | The tender has been extended up to 21.11.2023, 1500 hrs |
|
TENDER/2023-24/190 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OXYGEN PLASMA SYSTEM | 30/10/23 | 21/11/23 03:00 pm | TENDER_DOCUMENT_190.pdf (397.36 KB) | ||
TENDER/2023-24/223 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF HIGH PRESSURE CONTROLLER (CONFINING PRESSURE UNIT) | 31/10/23 | 21/11/23 03:00 pm | TENDER_DOCUMENT_2023-24_223.pdf (183.52 KB) | ||
TENDER/2023-24/197 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ANALYTICAL BALANCE | 27/10/23 | 17/11/23 03:00 pm | TENDER_DOCUMENT_2023-24_197.pdf (177.43 KB) | ||
TENDER/2023-24/162 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PHOTOELECTRIC APPARATUS | 17/10/23 | 16/11/23 03:00 pm | TENDER_DOCUMENT_2023-24_162.pdf (166.38 KB) CORRIGENDUM01 (99.87 KB) | ||
TENDER/2023-24/PRJ_054 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF WORKSTATION | 18/10/23 | 15/11/23 03:00 pm | TENDER_DOCUMENT_2023-24_PRJ_054.pdf (167.4 KB) CORRIGENDUM - I (108.27 KB) | ||
17/ IITPKD/EWD/2023-24/042 | Providing additional terrace water tank for Malhar(K01) & Saveri (K02) hostel at Sahyadri campus | 25/11/23 | 15/11/23 03:00 pm | Tender Document (327.25 KB) | ||
17/IITPKD/EWD/2023-24/042 | Providing additional terrace water tank for Malhar and Saveri hostels at Sahyadri campus | 25/11/23 | 15/11/23 03:00 pm | Tender Document (327.25 KB) | ||
TENDER/2023-24/149 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PORTABLE WATER QUALITY MULTIMETER ANALYZER | 03/10/23 | 06/11/23 11:00 am | TENDER_DOCUMENT_2023-24_149.pdf (200.6 KB) CORRIGENDUM (101.09 KB) | ||
17/IITPKD/EWD/2023-24/034 | Supplying and Fixing of PVC Roller curtains at Malhar & Saveri Hostel blocks at Sahyadri Campus | 20/10/23 | 02/11/23 03:16 pm | Tender Document (402.7 KB) Drawing_1 (644.6 KB) Drawing_2 (454.89 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/033 | Construction of Permanent Campus under Phase 1 A, SH Equipment and Furniture SW Providing and Fixing Furniture for Isolation room and Warden Rooms in Hostel Blocks Malhar and Saveri at Sahyadri Campus | 06/10/23 | 20/10/23 03:00 pm | Tender document (827.31 KB) | ||
TENDER/2023-24/142 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CIVIL LAB EQUIPMENTS | 20/09/23 | 11/10/23 03:00 pm | TENDER_DOCUMENT_142.pdf (531.79 KB) | ||
17/IITPKD/EWD/2023-24/031 | HIRING OF MAHINDRA BOLERO CAMPER (4WD) (A/C) WITH TAXI PERMIT FOR OFFICIAL PURPOSES OF IIT PALAKKAD | 22/09/23 | 09/10/23 03:00 pm | Tender Document (174.34 KB) | Tender has been extended up to 09.10.2023 at 1500 hrs. For further details https://mhrd.euniwizarde.com/ |
|
17/IITPKD/EWD/CIVIL/2023-24/032 | SUPPLY AND INSTALLATION OF GAS PIPELINE AT CHEMISTRY LAB AT SARASWATI BLOCK, SAHYADRI CAMPUS, IIT PALAKKAD | 26/09/23 | 05/10/23 03:00 pm | Tender Document (505.43 KB) | ||
TENDER/2023-24/139 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LAPTOPS | 14/09/23 | 04/10/23 03:00 pm | TENDER_DOCUMENT_139.pdf (312.68 KB) | ||
TENDER/2023-24/130 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRONIC WEIGHING BALANCE | 13/09/23 | 04/10/23 03:00 pm | TENDER_DOCUMENT_2023-24_130.pdf (192.18 KB) | ||
TENDER/2023-24/126 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DESKTOPS AND LAPTOP | 13/09/23 | 03/10/23 03:00 pm | TENDER_DOCUMENT_126.pdf (320.44 KB) | ||
17/IITPKD/EWD/ELE/2023-24/030 | PROVIDING OF TIMER FOR CORRIDOR LIGHTING OF MALHAR (K1) AND SAVERI (K2) AND UPS DB FOR INTERACTIVE CLASSROOM USING AS COMPUTER LAB AT SARASWATI BLOCK (A01), SAHYADRI CAMPUS, IIT PALAKKAD | 21/09/23 | 03/10/23 03:00 pm | Document (347.5 KB) | ||
TENDER/2023-24/140 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF NUCLEAR MAGNETIC RESONANCE NMR 500 MHZ | 10/09/23 | 25/09/23 10:00 am | TENDER_DOCUMENT- 2023-24-140.pdf (266.45 KB) | ||
TENDER/2023-24/PRJ_032 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MOTION CAPTURE SYSTEM EQUIPMENT AND ACCESSORIES | 28/08/23 | 18/09/23 03:00 pm | TENDER_DOCUMENT- PRJ_032.pdf (254.83 KB) Prebid Minutes (178.73 KB) | ||
TENDER/2023-24/094 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GLOVE BOX (TWO PORT) | 21/08/23 | 11/09/23 03:00 pm | TENDER_DOCUMENT-.pdf (194.76 KB) | ||
TENDER/2023-24/120 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LASER OPTICAL SUB-MICRON DISPLACEMENT MEASUREMENT SYSTEM | 21/08/23 | 11/09/23 03:00 pm | TENDER_DOCUMENT_120.pdf (339.56 KB) | ||
TENDER/2023-24/PRJ_028 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PLASMA POLISHING MACHINE | 16/08/23 | 06/09/23 03:00 pm | TENDER_DOCUMENT_PRJ_028.pdf (336.69 KB) | ||
TENDER/2023-24/117 | NOTICE INVITING TENDER (NIT) FOR CUSTOM MADE MEDICAL INSURANCE AND PERSONAL ACCIDENT INSURANCE FOR THE EMPLOYEES AND CUSTOM MADE MEDICAL INSURANCE AND PERSONAL ACCIDENT INSURANCE FOR THE STUDENTS OF IIT PALAKKAD | 18/08/23 | 04/09/23 05:00 pm | TENDER DOCUMENT (458.42 KB) PREBID MINUTES (182.2 KB) CORRIGENDUM REVISED ANNEXURE VI (126.12 KB) CORRIGENDUM 02 (75.58 KB) | The bid should be submitted offline dropped in the tender box or may be sent to IIT Palakkad by mentioning the tender number and title (Address: The Registrar, Kind attention “Officer-in-charge, Purchase Section”, Ahalia Integrated Campus, Kozhipara, Palakkad 678557) latest by 01-09-2023, 1500 hours. Bids received after the above-mentioned date and time shall not be considered. Prebid Meeting on 24-08-2023, 1500 hours |
|
TENDER/2023-24/108 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PORTABLE SPEECH RESEARCH ULTRASOUND SYSTEM | 14/08/23 | 04/09/23 03:00 pm | TENDER_DOCUMENT_108.pdf (320.64 KB) | ||
17/ IITPKD/EWD/2023-24/027 | SUPPLY OF MATERIALS FOR REPLACING 500 W SOLAR LIGHTING SYSTEM WITH DC FITTINGS & FANS INTO AC FITTINGS & FANS AT BAGESHRI BLOCK, NILA CAMPUS. IIT PALAKKAD | 14/08/23 | 28/08/23 03:00 pm | Tender document (206.16 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/028 | Name of work: Construction of Permanent Campus under Phase 1 A SW: Providing and fixing SS Curtain rods at Malhar B- Wing and Saveri A & B wing – Sahyadri Campus | 17/08/23 | 24/08/23 03:00 pm | Document (402.75 KB) | ||
17/ IITPKD/EWD/2023-24/024 | Shifting of Room furniture from Hostel 1, 2, 3, Dining table from Mess Block and Drawing table from Hostel 3 of Ahalia Integrated campus, Kozhipara, Palakkad - 678 557 to K01 (Third Floor) and K02 (All floors) and Kedaram (L1) (Ground Floor), A01 (Classro | 10/08/23 | 18/08/23 11:00 am | Recall- Tender Document (234.06 KB) Corrigendum (101.11 KB) Revised Tender Document (210.12 KB) | The hard copy submitted to Office of the Executive Engineer, EWD, IIT Palakkad on or before 18.08.2023, 1100 hrs. Late offer will not be accepted |
|
Tender No. TENDER/2023-24/PRJ_016 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF BENCHTOP XRF ANALYSER | 26/07/23 | 16/08/23 03:00 pm | TENDER_DOCUMENT - PRJ_016.pdf (184.69 KB) | ||
TENDER NO. 17/IITPKD/EWD/CIVIL/2023-24/025 | Name of work: Construction of Permanent Campus under Phase 1 A, SH: Equipment & Furniture SW: Providing and Fixing bookshelves for at K01 and K02 Hostel – Sahyadri Campus | 02/08/23 | 08/08/23 03:00 pm | Tender Document (402.63 KB) Drawings (215.25 KB) | ||
TENDER/2023-24/073 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF COMPUTER SERVER | 18/07/23 | 08/08/23 03:00 pm | TENDER_DOCUMENT (3).pdf (183.68 KB) | ||
TENDER/2023-24/057 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CAMERA SYSTEM WITH VISION ENGINE | 14/07/23 | 07/08/23 03:00 pm | TENDER_DOCUMENT (1).pdf (332.51 KB) | ||
TENDER/2023-24/064 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CONTACT PRESSURE MEASURING DEVICE | 14/07/23 | 07/08/23 03:00 pm | TENDER_DOCUMENT (2).pdf (174.27 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/026 | Construction of Permanent Campus under Phase 1 A, SH: Residential Buildings, SW : Providing & Fixing light roof for cloth drying area at K01 & K02 Hostel Blocks, Sahyadri Campus, IIT Palakkad | 03/08/23 | 07/08/23 03:00 pm | Document (475.86 KB) | ||
IITPKD/ADMN/SHA/02/2023-24 | NOTICE INVITING TENDER (NIT) FOR STUDENTS CANTEEN AT THE SAHYADRI CAMPUS, IIT PALAKKAD | 28/06/23 | 24/07/23 05:00 pm | Students canteen -Sahyadri campus -2023 (1).pdf (343.51 KB) Corrigendum_0.pdf (54.82 KB) | ||
17/ IITPKD/EWD/2023-24/016 | Operation of 11kV Substation and local substation, 11KV DG set at Sahyadri Campus, IIT Palakkad, Kanjikode, Palakkad -678623 | 07/07/23 | 17/07/23 03:00 pm | Tender Document (278.5 KB) Corrigendum (108.43 KB) | ||
17/IITPKD/EWD/CIVIL/2023-24/017 | Name of work: Construction of Permanent Campus under Phase 1 A, SH: Residential Buildings, SW : Providing & Fixing light roof for cloth drying area and Providing and fixing Curtain rods at K01 & K02 | 07/07/23 | 17/07/23 11:00 am | Tender document (483.45 KB) Corrigendum (108.14 KB) | ||
TENDER/HOS/2023-24/052 | SUPPLY AND INSTALLATION OF WASHING MACHINE FOR HOSTEL LAUNDRY AREA IN SAHYADRI CAMPUS HOSTELS – MALHAR & SAVERI | 05/07/23 | 15/07/23 03:00 pm | TENDER_DOCUMENT.pdf (325.31 KB) Corrigendum.pdf (119.83 KB) |